Descaling Services: Boiler Through Circulation Method

Procedure for Descaling a Boiler via Circulation Method:

  1. Prepare the Boiler:

    • Take the boiler offline and ensure the pressure is dropped to zero.
  2. Close Main Steam Valve:

    • Shut the main steam valve tightly to prevent chemicals from entering the steam system.
  3. Safety Valve and Hose Setup:

    • Remove the safety valve and connect a 1/2″ hose from this outlet back to the external mixing tank for chemical addition.
  4. Vent Arrangement:

    • Create a vent at the top of the boiler to release gases while preventing circulating water from escaping through the vent.
  5. Isolate Feed Water Pump:

    • Isolate the boiler feed water pump and pressure control system, including sight glass valves, before adding chemicals.
  6. Connect Bottom Blow Down Valve:

    • Use the bottom blow down valve to connect to the discharge of the recirculating pump for chemical entry.
  7. Determine Chemical Quantity:

    • Assess the flooded water content of the boiler to calculate the required amount of cleaning chemical.
  8. Prepare Mixing Tank:

    • Fill the mixing tank halfway to avoid overflow during the chemical addition process. Add the inhibited chemical (INDO 2200) to the tank.
  9. Start Recirculating Pump:

    • Initiate the recirculating pump to introduce the chemical-water mix into the boiler from the bottom.
  10. Chemical Addition:

    • Continue adding chemical to the mixing tank until the boiler is full and the water begins to return to the tank.
  11. Increase Temperature (Optional):

    • If possible, start the boiler briefly to raise the circulating water temperature to 100-120°C, enhancing chemical reaction time.
  12. Continuous Circulation:

    • Maintain circulation for a minimum of 8 hours.
  13. Neutralizing Compound:

    • After circulation, add a neutralizing compound (e.g., caustic) to the mixing tank to adjust pH to 7.

CAUTION: Use gloves and safety eyewear when handling chemicals to avoid splashes.

  1. Drain the System:

    • Stop the pump and drain the chemical-water mix from the boiler once cleaning is complete.
  2. Flush the Boiler:

    • Open the manhole and flush all areas with a pressure hose.
  3. Flush the Mud Drum:

    • Ensure the mud drum is also thoroughly flushed with a pressure hose.
  4. Replace Gaskets and Refill:

    • Replace all hand hole gaskets with new ones and refill the boiler with soft water, opening the feed water pump valves.
  5. Chemical Treatment:

    • Ensure the fresh water is treated with chemicals.
  6. Check for Leaks:

    • Start the boiler and inspect for any leaks.
  7. Normal Startup Procedure:

    • Follow standard boiler startup procedures at low fire.
  8. Manual Blow Down:

    • Perform manual blow down more frequently over the next 3 days to remove any residual scale.

SAFETY NOTES:

Delivering Quality Water Solutions by Unic Chem.

TO REACH US

Your Trusted Partner for Quality Water Treatment Chemicals and Services!

Let us help you maximize system efficiency, reduce maintenance costs, and save energy with our comprehensive water treatment solutions.

Contact Us